Carrying out engineering for loading, transporting and installing the decks of platforms A20 and A21 in the Abuzar oil field #2
Forozan Field F18 Platform Basic and Detailed Engineering Project The new F18 […]
The project of supplying machinery and equipment, purchasing materials and implementing all technical buildings of the route from km 2+600 to km 25+500
This contract is in line with the obligations of the contract between […]
Cutting, assembly, fit-up and welding project
In this project, the provision of manpower, equipment and consumables to perform […]
The project to build an oil storage tank and its accessories related to the Qeshm Oil Terminal project with a capacity of 540,000 barrels
Project Gallery https://farsadgroup.com/wp-content/uploads/2024/12/WhatsApp-Video-2023-08-02-at-6.16.00-PM.mp4https://farsadgroup.com/wp-content/uploads/2024/12/WhatsApp-Video-2022
Implementation of Civil Operations for the Construction of Qeshm’s Hira Pier
Execution of Civil Operations for the Construction of the Qeshm Hara Pier […]
Engineering project for the purchase, construction and installation of metal tanks for the Pump House No. 2 project, Gore-Jasg
F19 and FXA Platform Basic and Detailed Engineering Project in Forozan Field […]