In line with the construction of pump house number two Gore-Jask, the construction and installation of metal tanks Fire water Tank B, Fire water Tank A, Relief Tank and Elevated water Tank along with its metal skeleton were carried out by Farazan Sazeh Darya Company.

Number of tanks: 4 tanks, 2 of which are fire water storage tanks, 1 Relief tank and 1 aerial water storage tank.

Tank volume: Each about 5000 cubic meters

Project Gallery

Geographical location

Bushehr – Ahram County

Employer

Tous Asphalt/Oil Engineering and Development

status

Completed

Start date

۲۰۲۰

End date:

202020 (in 110 days)