Carrying out engineering for loading, transporting and installing the decks of platforms A20 and A21 in the Abuzar oil field #2
Forozan Field F18 Platform Basic and Detailed Engineering Project The new F18 […]
Carrying out engineering for loading, transporting and installing the decks of platforms A20 and A21 in the Abuzar oil field
Forozan Field F18 Platform Basic and Detailed Engineering Project The new F18 […]
The project of supplying machinery and equipment, purchasing materials and implementing all technical buildings of the route from km 2+600 to km 25+500
This contract is in line with the obligations of the contract between […]
Cutting, assembly, fit-up and welding project
In this project, the provision of manpower, equipment and consumables to perform […]
The project to build an oil storage tank and its accessories related to the Qeshm Oil Terminal project with a capacity of 540,000 barrels
Project Gallery https://farsadgroup.com/wp-content/uploads/2024/12/WhatsApp-Video-2023-08-02-at-6.16.00-PM.mp4https://farsadgroup.com/wp-content/uploads/2024/12/WhatsApp-Video-2022
Implementation of Civil Operations for the Construction of Qeshm’s Hira Pier
Execution of Civil Operations for the Construction of the Qeshm Hara Pier […]
Engineering project for the purchase, construction and installation of metal tanks for the Pump House No. 2 project, Gore-Jasg
F19 and FXA Platform Basic and Detailed Engineering Project in Forozan Field […]
LMU Design, Supply and Supervision Project for the Construction of the P4 Rashadat Platform
Offshore platforms are mainly installed for oil and gas extraction and refining […]
Basic and detailed engineering project of the F18 platform in Forouzan Field
F18 Platform Basic and Detailed Engineering Project, Foruzan Field The new F18 […]
Basic and detailed engineering project of F19 and FXA platforms in Forouzan Field
In line with the construction of pump house number two Gore-Jask, the […]
South Pars Gas Field Development Project, Offshore Platforms Phases 15 and 16
South Pars Gas Field Development Project, Offshore Platforms Phases 15 and 16 […]