SOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 15 AND 16 OFFSHORE PLATFORM

South Pars Gas Field is located offshore about 100 km South West of Assaluyeh, Persian Gulf, Iran. NIOC intends to develop South Pars Gas Field phases 15 and 16. POGC has been selected for the development of entire field. They have given a contract to IOEC/ ISOICO/ SAFF for the offshore portion. IOEC is the pipeline and offshore installation contractor. ISOICO is phase 16 EPC Contractor and SAFF is phase 15 EPC Contractor. Basic/ FEED has been performed by Aker Kvaerner and detail design is to be done by SLTE.

The offshore development of phases 15 and 16 consists of two wellhead platforms SPD15 and SPD16. Each phase has one wellhead platform, one intermediate support platform bridge connected to the flare platform. Each wellhead platform has 15 slots. Produced gas is routed via 32 inch pipeline to onshore facilities in Assaluyeh. Gas export line is accompanied with a 4 inch MEG line.

Wellhead platforms are unmanned with a small facility for crew which may happen to spend the night. Power generation is by two generating sets. Fiber optic subsea cable takes the control signals to the nearby phases 2/3 platforms. From there it is routed to phase 15 and 16 Onshore Plant and also to SPQ1 central control room.