South Pars Gas Field Development Project, Offshore Platforms Phases 15 and 16

South Pars Gas Field Development Project, Offshore Platforms Phases 15 and 16 […]

مشاهده پروژه

Basic and detailed engineering project of F19 and FXA platforms in Forouzan Field

In line with the construction of pump house number two Gore-Jask, the […]

مشاهده پروژه

Basic and detailed engineering project of the F18 platform in Forouzan Field

F18 Platform Basic and Detailed Engineering Project, Foruzan Field The new F18 […]

مشاهده پروژه

LMU Design, Supply and Supervision Project for the Construction of the P4 Rashadat Platform

Offshore platforms are mainly installed for oil and gas extraction and refining […]

مشاهده پروژه

Implementation of Civil Operations for the Construction of Qeshm’s Hira Pier

Execution of Civil Operations for the Construction of the Qeshm Hara Pier […]

مشاهده پروژه

The project to build an oil storage tank and its accessories related to the Qeshm Oil Terminal project with a capacity of 540,000 barrels

Project Gallery https://farsadgroup.com/wp-content/uploads/2024/12/WhatsApp-Video-2023-08-02-at-6.16.00-PM.mp4https://farsadgroup.com/wp-content/uploads/2024/12/WhatsApp-Video-2022-02-03-at-10.08.24-1.mp4   Geographical location Bushehr   Unit Building, civil engineering […]

مشاهده پروژه

Implementation of Civil Operations for the Construction of Qeshm’s Hira Pier

Execution of Civil Operations for the Construction of the Qeshm Hara Pier […]

مشاهده پروژه

Cutting, assembly, fit-up and welding project

In this project, the provision of manpower, equipment and consumables to perform […]

مشاهده پروژه