construction of fire water pool related to Qeshm oil terminal

In order to carry out the Qeshm oil terminal project, the construction of the fire water pool related to the Qeshm oil terminal is being carried out by Farazan Sazeh Darya Company.

The Construction an oil storage tank and its accessories Project related to the Qeshm oil terminal project

This project Include with a capacity of 540,000 barrels and a weight of about 2,800 tons in Qeshm Island

HDPE fire water system construction project related to Qeshm oil terminal

In order to carry out the Qeshm oil terminal project, implementation of construction and piping operations of HDPE fire water system related to Qeshm oil terminal, which in two phases 1 and 2 with a total volume of 19,000 cubic meters of drilling and 27,000 inches of welding It is being carried out by Farazan Sazeh Darya Company.

Engineering, Procurement, Construction and Installation of four Fixed roof tanks in Ahram- Boushehr

This Project Include three fixed tanks and one elevated tank for No.2 Pump Station of Gure- Jask Project. Weight of tanks is about 550 MT.

Installation project of steel structures of shelters, sheds and buildings Pump house project No. 2, Gore-Jasag

In order to construct the pump house No. 2 Goreh-Jask, the installation of steel structures of shelters, sheds and project buildings was carried out as follows by Farazan Sazeh Darya Company

PLEM DETAILE DESIGN & INSTALLATION ENGINEERING (Soroosh Field)

The Iranian Offshore Oil Company (IOOC) intends to further renovate and develop the Soroush and Nowruz oil fields through the Soroush Renovation and Development Project. Soroush and Nowruz squares are located in the Persian Gulf. Soroush Square is located about 80 km southwest of Kharg Island.

SOROOSH RENOVATION AND DEVELOPMENT PROJECT, PIPELINE INSTALLATION ENGINEERING

Soroush Square well equipment is located on two well platforms. SWP-1 platform is connected to Soroush complex through a bridge, while SWP-2 platform is located 4 km south of Soroush complex.

BAHREGANSAR SUBSEA PIPELINE INSTALLATION ENGINEERING PROJECT

Of all the facilities installed in this field, 4 well platforms named WHP4, WHP5, WHP6, and WHP7, 1 multi-well platform called MWP and 1 multi-platform platform called MP were considered in this project. The aim of this project was to connect well platforms to the multi-platform platform through new pipelines.