اسکله نفتی حرا قشم

Execution of Civil operation for construction of Qeshm herra wharf

Qeshm mangrove construction project with the aim of creating facilities and equipment in supplying feed and transferring the product of neighboring refineries (Pars Behin Qeshm oil refinery and other refineries) by two berths of 70,000 tons and 7,000 tons and considering the development and water supply plan The required started

FYB JACKET AND TOPSIDE INSTALLATION ENGINEERING

In this project installation engineering of FYB jacket and topside has done by FARDA Co. water depth was 48.3m for FYB platform.

Loadout-of-F18-Jacket-Forouzan-Oil-Field

F18 PLATFORM OF FOROOZAN FIELD BASIC AND DETAIL ENGINEERING

IRANINAN offshore oil company (I.O.O.C) intends to further develop the FOROOZAN fields through execution of the FOROOZAN new F18 wellhead platform project.

S1 installation

S1 PLATFORM OF SALMAN FIELD BASIC AND DETAIL ENGINEERING

Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project.

jacket-top-overall-view

F18 JACKET AND TOPSIDE INSTALLATION ENGINEERING

FarazanSaze Darya (FARSAD) Co. has done F18 Jacket and Topside Installation Engineering.

SOROOSH FSU ANCHOR PILES RECTIFICATION

FarazanSaze Darya (FARSAD) Co. has done prepared a new method for rectification of piles. This method Was the first method of rectification in Iran & all Engineering have done by FARDA Co.

SPOL TOPSIDE INSTALLATION ENGINEERING

SPOL is an oil platform in south pars oil layer, this topside constructed in SAFF yard, SAFF Co. was EPCI contractor for this project, and SADAF was responsible for Installation. Installation Engineering has done by FARDA Co.​

F19& FXA Platform of Foroozan Field Basic and Detail Engineering

The project of a new F19 well platform in Forouzan oil area has started. Farazan Sazeh Darya Company is responsible for basic and detailed engineering of this platform in the structural and architectural sections, piping, fixed and rotating mechanics, pipelines and submarines.

SOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 15 AND 16 OFFSHORE PLATFORM

The project of a new F19 well platform in Forouzan oil area has started. Farazan Sazeh Darya Company has been responsible for performing basic and detailed engineering of this platform in the structural and architectural sections, piping, fixed and rotating mechanics, pipelines and submarine cables.

SOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 12

Petro pars Ltd (COMPANY) intends to develop new facilities in the Persian Gulf from Phase 12 of the South Pars Gas field development called SPD12E.​