Qeshm mangrove construction project with the aim of creating facilities and equipment in supplying feed and transferring the product of neighboring refineries (Pars Behin Qeshm oil refinery and other refineries) by two berths of 70,000 tons and 7,000 tons and considering the development and water supply plan The required started
IRANINAN offshore oil company (I.O.O.C) intends to further develop the FOROOZAN fields through execution of the FOROOZAN new F18 wellhead platform project.
Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project.
FarazanSaze Darya (FARSAD) Co. has done prepared a new method for rectification of piles. This method Was the first method of rectification in Iran & all Engineering have done by FARDA Co.
SPOL is an oil platform in south pars oil layer, this topside constructed in SAFF yard, SAFF Co. was EPCI contractor for this project, and SADAF was responsible for Installation. Installation Engineering has done by FARDA Co.
The project of a new F19 well platform in Forouzan oil area has started. Farazan Sazeh Darya Company is responsible for basic and detailed engineering of this platform in the structural and architectural sections, piping, fixed and rotating mechanics, pipelines and submarines.
The project of a new F19 well platform in Forouzan oil area has started. Farazan Sazeh Darya Company has been responsible for performing basic and detailed engineering of this platform in the structural and architectural sections, piping, fixed and rotating mechanics, pipelines and submarine cables.