F18 JACKET AND TOPSIDE INSTALLATION ENGINEERING

The NEW FOROOZAN F18 wellhead platform project foresees the construction of one new platform at or near the existing FOROOZAN complex together with infield pipelines & submarine cables and Necessary extension of existing of FX platform. Water depth ranges about 50 m.

F18 platform initially was a four legged batter structure but due to installation difficulty in lift operation it changed to a jacket with single batter in one row and no batter for the other row. Piles (1524 mm diameter) will be driven through legs Jacket should installation whit lift method the weight of jacket is about 1000 ton.

FarazanSaze Darya (FARSAD) Co. has done F18 Jacket and Topside Installation Engineering.

jacket-1
jacket-2
jacket-top-overall-view
Loadout-of-F18-Jacket-Forouzan-Oil-Field
f18-Risers-Preparation-for-Hydro-Test
Refurbishment-of-the-Platform-in-Bahregan-and-Norooz-Oil-Field-Repairing-and-Painting-of-Hendijan-Bahregansar-and-Norooz-Platforms